Shanghai Zenyan Automation Engineering Co., Ltd.

enLanguage
Automotive Turbocharger Assembly Line
video
Automotive Turbocharger Assembly Line

Automotive Turbocharger Assembly Line

We built this fully automatic line for five types of turbochargers. It is a non-standard turnkey project, starting with core assembly and ending with finished packing — everything is automated. Our company has been developing such solutions since 2010, providing extensive experience in custom automation.

Product Introduction

Automotive Turbocharger Assembly Line

 

Six Stations That Do All the Work

We built this fully automatic line for five types of turbochargers. It is a non-standard turnkey project, starting with core assembly and ending with finished packing - everything is automated. Our company has been developing such solutions since 2010, providing extensive experience in custom automation.

102
111

The line consists of six work stations:
• OP10 – Core Assembly Station: Installs retaining rings, floating bearings, the turbine shaft, seals, and the wheel. Supports snap rings and WH1C structures.
• OP20 – Nut Tightening Station: Automatically tightens the wheel nut and checks shaft end play and seal performance. Only parts that pass both tests move on.
• OP30 – Balancing Station: Performs automatic dynamic balancing. Assembly is accepted only if the unit runs stably at high speed.
• OP40 – Compressor Housing Assembly Station: Installs the nameplate and housing with torque-controlled tightening, compatible with clamp and snap ring structures.
• OP50 – Turbine Housing Assembly Station: Positions and clamps the turbine housing, installs the core, and tightens plate screws with torque control.
• OP60 – Wastegate Station: Installs the wastegate, runs performance tests, and then adds the retaining ring, hose, and dust cover before automatically packing the part.

Three Core Tests on Every Part

Every product undergoes thorough testing:
1. Shaft end play (100% of parts)
2. Sealing (100% of parts)
3. Wastegate performance (100% of parts)
4. Dynamic balance (100% of parts)

No step or test is skipped, ensuring every turbocharger meets strict quality standards.

113

 

109
110
117
118
114
115
116

 

Specifications Table

Parameter

Detail

Applicable Product

Five types of turbochargers

Core Stations

Core assembly, nut tightening, end play test, seal test, dynamic balance, housing assembly, wastegate test, packing

Control System

Siemens PLC + HMI

Equipment Type

Non-standard, custom, fully automatic assembly and test line

 

103001
104001
105001
106001
107001

108

 

We Deliver From Design to Production

We provide complete turnkey solutions: planning, design, manufacturing, debugging, and production support. Simply provide your requirements and budget. Our R&D team handles custom mechanical, electrical, and software solutions. Machines can be built from your drawing or sample. Single-unit custom orders are accepted.

 

Custom sample lead time is 4 to 12 weeks, depending on complexity. We provide pictures and videos at each planned milestone, keeping you fully informed of the progress of your Automotive Turbocharger Assembly Line.

 

Hot Tags: automotive turbocharger assembly line, China automotive turbocharger assembly line manufacturers, factory

You Might Also Like

(0/10)

clearall